Tribunals · Chelmsford City Council · 2017 rating list

Telephone Engineering Centre, Rodney Way, CM1 3BY

Workshop and Premises Decided 4 March 2026 CHG101163777 Colliers International - Matthew Hawkins

OutcomeDismissedThe appeal failed and the rateable value was left unchanged.
Original RV£224,000
Ratepayer sought—
VO conceded first—
Tribunal decided£224,000

Figures are as stated in the decision; a dash means the document does not state that figure.

What was argued and what the tribunal found

The appellant's surveyor (Colliers) argued that the hard surfaced land should be reduced from 1,920.9m² to 588m² to exclude overage, and sought a 10% allowance for fragmentation between the two detached workshops separated by land. The tribunal found the VO's assessment justified: the surfaced land represented only 16% of total land (excluding buildings), which was reasonable, and any fragmentation disadvantage was already reflected in the main space price of £45/m², so granting an additional allowance would constitute double-counting. The appeal was dismissed.

Summary generated from the decision text and checked against it. The appellant was Appellant company (represented by Colliers), represented.

Grounds argued

  • Floor area or measurement
  • Quantum or end allowance
Evidence
Settled assessments, Photographs
Cases cited
Gardiner & Theobald LLP v David Jackson (VO) [2018] UKUT 0253 (LC); Jan De Rijk Transport v VO CHG101125668
Hearing
27 February 2026

Similar decisions

All decisions in Chelmsford City Council · Industrial and warehouses nationally

Is your own rateable value in line?

A free check compares a property with the assessments around it and says plainly whether there is anything worth pursuing.

Check a property

The tribunal’s decision in full

Download the PDF · Find it on valuationtribunal.gov.uk

Decision © Crown copyright, published by the Valuation Tribunal Service under the Open Government Licence v3.0 and reproduced unaltered. This site does not index the names of private individuals that appear in decisions. Information, not advice.